Skip to content
ޔައުމިއްޔާDocumentation
Menu

Formal minutes

Last updated 30 September 2026

On this page

Overview#

The Minutes tab turns the transcript into a structured, formal document laid out by a template (Board, Committee, Project and others). Every item cites the words it came from. You can edit fields, have the AI rewrite a passage, add an agenda, switch the document language, export to Word or PDF, and send the minutes for approval.

Purpose#

To produce minutes you can stand behind, with evidence links, without writing them from scratch.

Who uses it#

The meeting owner (secretary / minute-taker). Approvers review them; see Minutes approval.

Screenshots#

Before creating minutes (set-up)
Set-up, annotated
  1. Template
  2. Edit layout
  3. Document language
  4. Sections preview
  5. Agenda file
  6. Reference files
  7. Create minutes
  1. Template: Management · Board · Committee · Council · Project · HR · Procurement · Interview · Notes · + New template.
  2. Edit layout: reorder, rename or switch off sections.
  3. Document language: English / ދިވެހި.
  4. Sections preview for the chosen template.
  5. Agenda file (optional).
  6. Reference files (up to 3; "PDF, Word, PowerPoint or text · up to 10 MB each").
  7. Create minutes · N credits ("Every item links to the words it came from.").
Generated minutes (draft)
Generated minutes

Interface explanation (generated minutes)#

  • Status bar: Draft with Submit for approval.
  • Agenda & files (collapsible) and What we took from your files, e.g. the agenda items, people, terms and figures read from the agenda.
  • Who is speaking: a roster of speaker names and roles.
  • Document title (e.g. "Project Progress Report"), with the legend: "✓ means a number or exact phrase was found in the words quoted from the recording. 'Check' marks the AI's reading of those words."
  • Sections, each with Regenerate · 1. Each item has Edit, More formal, Shorten, a ▶ timestamp and the quoted source words. Edited items are tagged your wording or AI formal, with Undo.
  • Follow-ups and export buttons at the bottom.

Templates (as observed)#

TemplateSections (observed for Project and Notes)
ProjectMeeting details, Attendees, Progress, Milestones, Blockers, Risks, Dependencies, Decisions, Action items, Next review, Other matters recorded
Notes (default)Meeting details, Present, Apologies, Notes, Decisions, Action items, Next meeting, Other matters recorded
Management, Board, Committee, Council, HR, Procurement, InterviewAvailable as chips; sections not individually captured

The Minutes layout drawer (from + New template or Edit layout) lets you drag sections, switch them on or off, rename headings, Add section, and either Use for this meeting only or Save as template with a name.

Layout editor

See it in action#

Choosing the Project template, adding the agenda and creating the minutes, recorded on the real app. The wait while the minutes are built is sped up.

0:00 / 0:17
Step-by-step, without the animation
  1. Step 1 Pick the template that fits the meeting

  2. Step 2 Add the agenda to sharpen the minutes

  3. Step 3 Create the minutes

  4. Step 4 A formal draft, laid out by the template

  5. Step 5 Every item quotes the words it came from

  6. Step 6 Action items, each backed by what was said

How to use#

  1. Open the Minutes tab and pick a template (e.g. Project).
  2. Optionally attach the Agenda (the price rose from 3 to 4 credits, "incl. files").
  3. Press Create minutes · N credits. "Building the minutes…" shows while it works (about 15 s for the test meeting).
  4. Open Who is speaking and add roles; press Save per person.
  5. Fix fields with Edit → Save; use More formal or Shorten for AI rewrites; Undo reverts.
  6. If you later correct the transcript, press Update · free on the notice.
  7. Export (Print / PDF, Download Word) or Submit for approval.
Roster with roles
Editing a field
Edited: "your wording"
Before AI rewrite
After "More formal"
Transcript changed notice
After update (files panel)

Follow-ups and exports#

0:00 / 0:14
Step-by-step, without the animation
  1. Step 1 Add each speaker's role once

  2. Step 2 Correct any detail in your own words

  3. Step 3 Your wording is kept, and marked as yours

  4. Step 4 Send the outcome as a follow-up email

  5. Step 5 Print, save as PDF, or download Word

Follow-ups
OutputControlsVerified
Follow-up emailCopy subject, Copy email, Share, WordUI (Word file returned, 9 KB)
Action listCopy, Share, WordUI (buttons)
Decision registerCopy, Share, WordUI (buttons)
A letter or email of your ownWrite with AI (opens the Assistant)UI
Print / PDF/print/<id>/minutesUI; saved as sample PDF
Download Word…-minutes.docx (11 KB)UI (file returned)
Regenerate allRebuilds every section (costs credits: "Regenerating costs 4 credits incl. files")Not pressed
Share offers WhatsApp, Viber ("Only the start fits; full text will be copied"), Telegram and Email.
Share menu
The print view marks your edits with [edited] and lists source timestamps:
Print view

Document language#

Switching to ދިވެހި changes the headings and labels to Dhivehi at no cost. Quoted speech and your own wording stay as they were.
Dhivehi minutes

Example scenario#

For the "Digital Services Improvement Meeting" with the Project template and the agenda file, the app produced:

  • Chair Hassan Ahmed; four attendees.
  • Progress: second development phase about 80% complete.
  • Milestone: usability testing sign-off.
  • Blocker: document uploads time out on slow connections.
  • Risk: November deployment window may be tight.
  • Decision D-01.
  • Actions A-01 to A-04, with responsible people "from speaker names" and deadlines (9 October, 12 October, before the next meeting, by Friday).

Date and Organisation were filled in by hand ("your wording"), and D-01 was made more formal ("AI formal").

Expected result#

A complete draft with evidence for each item, ready to export or submit for approval.

Important notes#

  • Manual edits and AI rewrites survived "Update · free" after the transcript changed. The update removed a duplicate attendee ("Ibrahim Nazir") that came from the transcriber's misspelling. (VERIFIED THROUGH UI)
  • Fixed on 30 Sep 2026: after Update · free (or a section Regenerate) the panel used to stay on "Building the minutes…" until the page was reloaded. The update ends on the same status it started from (ready → ready), and the panel only re-synced when the status changed. It now also watches the minutes generation (lib/minutes/status-sync.ts). Re-tested: the panel switches to the new version by itself within about 10 seconds.
  • Per the source, an edit is limited to 8,000 characters, and "Only the meeting's owner can have them made" is shown to viewers.
  • Custom template saving, Regenerate (section or all) and reference files were not exercised.